lundi 20 octobre 2008
Stage 1: (0-6 months)
Goal: It has to be perfect.
Budget: Minimum possible. This should work out to about 500€ per room.
Objective: Get to spend lots of quality time with my sweetie.
Things to be done: Absolutely everything. Re-do the walls, tear up the floor and install hardwood floors, consider knocking out a wall or two.
Projected timeline: It should be done in 6 months.
Stage 2: (6 months to one year)
Goal: Well, maybe it won't be perfect but at least it will be how we want it (colors, wallpaper, bathroom tiles, etc)
Budget: Okay, perhaps this will be more expensive than we planned. But we will spend the money for the stuff that is important to us, and cut back in other areas.
Objective: Learning about how to renovate a home- paint, tile, etc.
Things to be done: All the major stuff- walls, kitichen, bathroom, etc. Decide that you can live with the ugly floor tile and will just cover it up with a rug.
Projected timeline: This should be done 1 year-1.5 years
Stage 3: (1 year to 2 years)
Goal: Well; maybe it won't be perfect but it at least it will be done.
Color of blue paint not exactly what we expected? Oh well. We can live with it.
Budget: Yikes, 1500€ for three closet doors? What are they on crack?
Objective: Just want the damn thing done.
Things to be done: Well, let's just do the basics- repaint, etc.
Projected timeline: This can't possibly take much longer.
Stage 4: (2+ years)
Goal: Hope we are still married by the time this renovation is finished.
Budget: Don't care, just pay. Too sick and tired of comparing paint samples, visiting 4 home improvement stores to find a doodad that is 5€ cheaper. Don't even feel like going back to the store to return the wrong item. At this point, what is another 15€?
Objective: Don't kill each other.
Things to be done: Can we go back in time to how it was before we started the renovations and just live with it?
Projected timeline: The renovations are finished or I chew off my arm, whichever comes first.
Goal: It has to be perfect.
Budget: Minimum possible. This should work out to about 500€ per room.
Objective: Get to spend lots of quality time with my sweetie.
Things to be done: Absolutely everything. Re-do the walls, tear up the floor and install hardwood floors, consider knocking out a wall or two.
Projected timeline: It should be done in 6 months.
Stage 2: (6 months to one year)
Goal: Well, maybe it won't be perfect but at least it will be how we want it (colors, wallpaper, bathroom tiles, etc)
Budget: Okay, perhaps this will be more expensive than we planned. But we will spend the money for the stuff that is important to us, and cut back in other areas.
Objective: Learning about how to renovate a home- paint, tile, etc.
Things to be done: All the major stuff- walls, kitichen, bathroom, etc. Decide that you can live with the ugly floor tile and will just cover it up with a rug.
Projected timeline: This should be done 1 year-1.5 years
Stage 3: (1 year to 2 years)
Goal: Well; maybe it won't be perfect but it at least it will be done.
Color of blue paint not exactly what we expected? Oh well. We can live with it.
Budget: Yikes, 1500€ for three closet doors? What are they on crack?
Objective: Just want the damn thing done.
Things to be done: Well, let's just do the basics- repaint, etc.
Projected timeline: This can't possibly take much longer.
Stage 4: (2+ years)
Goal: Hope we are still married by the time this renovation is finished.
Budget: Don't care, just pay. Too sick and tired of comparing paint samples, visiting 4 home improvement stores to find a doodad that is 5€ cheaper. Don't even feel like going back to the store to return the wrong item. At this point, what is another 15€?
Objective: Don't kill each other.
Things to be done: Can we go back in time to how it was before we started the renovations and just live with it?
Projected timeline: The renovations are finished or I chew off my arm, whichever comes first.
Libellés :
Our Apartment
Inscription à :
Publier les commentaires (Atom)
About Me
Blog Archive
Libellés
- 101 (13)
- Aix en Provence (13)
- Alain (22)
- Baby (11)
- Bureaucracy (14)
- Cooking (14)
- Daily Life (31)
- Dealing with the French (33)
- Entertainment (1)
- Ex-patness (14)
- Family (37)
- Food (1)
- French Customs (40)
- French Language (20)
- Friends (10)
- Fromage (14)
- Health (21)
- Hobbies (4)
- Holidays (29)
- Homesick (11)
- Jobs (10)
- July 22 (5)
- Marriage (1)
- Marseille (10)
- Me (3)
- Memories (3)
- Misc (40)
- Mishaps (16)
- Motorcycle (5)
- Music (2)
- Nationalité (3)
- Our Apartment (45)
- Overheard (2)
- parenting (2)
- Patents (24)
- Pictures (25)
- Provence (32)
- Ramblings (21)
- Random (1)
- Rants (30)
- Restaurants (1)
- Rugrats (7)
- S. (2)
- Scientific Stuff (4)
- Social Awkwardness (1)
- Sports (1)
- Strasbourg (13)
- Trips (52)
- VMI (12)
- Wedding (24)
- Wine (2)
- Wordless Wednesday (3)
Favorite Posts
-
I picked up my French passport this morning. It has been ready for awhile, I received the text message saying it was available for pick-up a...
-
The above cartoon for kids to color, cut out, and fold into a cube shape. Then the cube is to be placed in the center of the table for remi...
-
Here is the other cross-stitch I finished this year, this one is for Alain's Aunt, Lydia. I have now done at least one for every hous...
-
Come to an end. My maternity leave is ending and I return to work on Monday. Alain will then take his two weeks of paternity leave, then we...
-
you buy something from Sephora and get "premiér rides" (first wrinkles cream) samples. Sigh. Today is my birthday. The big 3-0. Su...
-
Someone had other plans. Our daughter S. decided to make her appearance weeks ahead of schedule. (We have decided not to post her full name,...
-
One more month... More or less. One more week of work. I was actually supposed to stop February 4th (six weeks before D-Day) but now French...
-
I think I am entering the 'tired' stage of pregnancy. And no, not just physically tired. Tired of lying down, tired of sitting, tire...
-
Got back from Strasbourg just fine. My wallet however, did not. After my long train trip back home, and being called "sale race" (...
4 commentaires:
This is too funny. Is it bad enough that you want your parents to come back and LIVE with you until it is done?
Mom
Oh, I feel your pain.
that is hilarious. it sounds exactly like our renovation project. Except we have newborn twins to factor in. and we're not married. That way we can't divorce, you see?
Whenever I see one of those renovation TV shows I am always in awe of the finished product. I am in awe because I know if my husband and I started a project like that, we'd probably be living in rubble and unfinished surrounds for the duration. I'm impressed you've gotten this far!
Jess